Update on Measure E and C: Spring Quarter 2007

 

Projects in Construction

Campus Center: Renovations for this project include a food court servery area as well as major mechanical upgrades. The majority of the upstairs has been closed for renovations since fall 2006 and in order to complete the renovations, the kitchen and the food service operation closed on March 23, 2007. Refreshments will still be provided by various food vendors, the Bookstore and Ian's Coffee. The old Bookstore will remain open for seating. The lower level will be closing in mid May. The EOPS, Financial Aid, Student Accounts, Student Activities, and the Flea Market departments will move to the temporary modular trailers over in Lot C by the tennis courts. The DASB and ICC clubs will move to ADM 106. Le Cafe will also be closing in mid May. Health Services and Campus Safety and Security will remain in HCC175. Renovations will be complete to the whole campus center in late summer and all the departments, including food services, will move back for fall quarter 2007. The project budget is $5.1 million and primarily funded by the student body through the Campus Center Use Fee.

Campus Entries: The goal of the project is to improve traffic flow off campus as well as improve on-campus circulation and access to the campus. Two new campus entrances have been created. The first adjacent to the Flint Parking structure and the other in Parking Lot A. Two emergency exits, one on McClellan Rd and one on Stelling Rd are complete. This project also provided the campus with two electronic message signs, one by the Flint parking structure and one on the corner of Stevens Creek Blvd. and Stelling Rd. Other design features included in this project are landscaping, new city sidewalks, and enhanced pedestrian lighting. The project is scheduled for completion in mid 2007. This is a $2.6 million project.

Forum: The Forum project budget is split between Measure E and Measure C funding. The design phase of approximately $320,000 was funded by Measure E dollars. The construction budget of $2.2 million will be funded by Measure C dollars. Renovations to the Forum began last quarter and work includes upgrade of Hazmat and HVAC systems, room finishes including new seating, ADA upgrades, and the addition of faculty offices. The Forum is scheduled to be complete in time for fall quarter 2007.

Planetarium: Work on this project commenced in April 2006. The project includes upgrades to the electrical/HVAC systems, the restrooms, refurbished seats, new finishes, a new Star projector and a replacement dome. The $1 million Konica Minolta next generation Infinium S Star projector, which replaced the old Minolta Star Machine installed in 1970, arrived from Japan and has been installed. The funding for the projector came from State Capital Outlay dollars. The new dome, which was partly purchased from the proceeds from the October 2006 "A Night of Magic" has also been installed. The dome construction is made up of a ribbing base on which panels, with hundreds of holes in them to limit the amount of reflection from the star projector, are hung. Renovations to the Planetarium classroom are complete and the classroom is open this quarter. The Planetarium itself is scheduled to open later this quarter. This is a $1.2 million project (excluding the Infinium S Star projector and partial funding of the dome).

 

Projects in Design

E1: The E1 design budget of approx. $200,000 is split between Measure E and State Workforce Renovation funding (AB1802). The design phase will be complete in summer. The construction part of this project, approx. $2 million, will be funded with Measure C dollars and is scheduled to commence in Spring 2008.

Performance Hall: This project was approved by the DSA (Department of State Architects) and is currently out to bid. We will be breaking ground in July 2007 with completion scheduled for winter 2008. The demobilization of the Mod Quad trailers are complete with some trailers being relocated to parking lot C, by the tennis courts, for use as swing space for the departments in the lower level of the campus center while it is being renovated. State Capital Outlay and Proposition 55, which passed in 2004, will augment the Measure E dollars allocated for this project and there have also been external fund raising efforts. The current budget is $12.5M

 

Projects Deferred to Measure C

Campus Site Lighting

Master Landscaping

Signage

Projects Completed Through December 2006

  • A Quad (Phase I) A5 & A7 Renovation: Completed fall quarter 2002. This was a $1.2 million project.
  • A Quad (Phase II) all except A5, A7, A8 & A9: This was a $2.5 million project.
  • A Quad (Phase III) A9: Major renovations to the four classrooms are complete. The Euphrat is still located in A9 until the Performance Hall is completed. This was a $1.5 million project. A8: This project included upgrades to the electrical and lighting systems. The project budget was $250,000.
  • Administration Building: The renovation of the building is complete and includes the addition of four new multimedia classrooms (one 45-seat, two 90-seat, and one 110-seat) and a new mailroom. The renovations also included conference rooms, the Emergency Operations Center, new restrooms and a workroom, This was a $3.6 million project.
  • Athletics Fields & Tennis Courts: These areas were completed during summer 2005. The budget was $3 million.
  • Athletic Fields Barrier Netting: This project included three netting barriers. Two barriers are between the baseball/softball fields and the Kirsch Center and the third is between the tennis courts and the fields.
  • Boilers: Completed in June 2002.
  • Child Development Center (Landscaping): Phase I & II. Phase I was completed in September 2003 and phase II was completed in January 2005.
  • Child Development Center (New Addition): Completed in the summer of 2002. This was a 11,500 sq. ft. $5 million project.
  • Child Development Center (Renovation of Old Building – Wing A): This was the first phase of the two-phase renovation of the old Child Development Center building. Renovations were completed in winter 2003.
  • Child Development Center (Renovation of Old Building – Wing B): This was phase II of the renovation of the old Child Development Center building. Renovations were completed in July 2003.
  • Child Development Center – New playground funded by the Packard Foundation.
  • California History Center: Repainting of the exterior and repair of the balustrades at the west and east ends of the sunken garden. This project was completed in June 2006.
  • E2: Completed fall quarter 2002 at a cost of $820,000.
  • E3: Completed summer 2006 as a part of the S-Quad project.
  • Faculty Office Renovation Project: Completed in the spring of 2002. It was a $1.5 million project.
  • Kirsch Center for Environmental Studies: The Kirsch Center was on-line in fall quarter 2005. This was an $11 million project.
  • L Quad - L1, L2, L3, L4, L5, L6, L8 and MCC Renovation: These were all complete by July 2003 at a cost of $4.3 million.
  • Lot A & B Landscape: The landscape in this area was planted over the winter 2004 at a cost of $270,000.
  • OTI Relocation: The OTI staff moved to their new site in summer 2002.
  • Parking Lot A & B Reconfiguration and Stelling Campus Entry: This project was carried out in the summer of 2003 and completed in time for fall quarter 2003. It was a$2.3 million project.
  • Parking Structure: The lower section of the parking structure opened in fall quarter 2004, with the whole structure open in winter quarter 2005. The project budget was $12.8 million.
  • PE Quad Renovations: Work was completed in this area during summer 2005. The total budget was $9 million.
  • Pool Renovation: Work was completed in March 2003. This was a $1.6 million project.
  • Restrooms: Renovations to S2, S6, L5 and the Athletic Field restrooms took place from October 2005 through May 2006 at a cost of $580,000.
  • S Quad: This was an extensive, multi-phase, renovation project. Work is now complete on all phases. The final buildings in this renovation project, S5 and E3, were completed in summer 2006. Work included upgrading classroom and labs, HVAC/electrical systems, new casework, and fixed seating.
  • S1 S8 Cross Connect: This project was completed in spring 2005.
  • Science Center: The Science Center was on-line for fall quarter 2004. This was a $21 million project, which took 23 months of construction to complete.
  • Student and Community Services Center: The Student and Community Services Center was on-line in summer 2005. This was a $15 million project.
  • Tree Relocation: Two oak trees relocated in September 2002.

We truly appreciate the cooperation we have seen from everyone and appreciate your continued patience as we continue our campus upgrade projects.

Budget figures and timelines are approximations and are subject to change.